Print this page
14 November 2019 Posted by 

70% OF OFFICE SPACE PRE-COMMITTED

KNIGHT Frank estimates that 70 per cent of the 280,000-plus square metres of office space under construction in the Parramatta CBD have been pre-committed, with no new supply the headline vacancy rate has tightened from 3.0 percent to 2.7 per cent in the six months to July 2019, in its September Parramatta Office Market Report.



editor

Publisher and editor, Michael Walls.
Mobile: 0407 783 413
Email: info@wsba.com.au
Mail: PO Box 186, Kurrajong NSW 2758
Office phone: 61 2 4572 2336